United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· ERCOT

Prairie Point Wind

Prairie Point Wind is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue, in Grayson County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2018 (completed)
  2. Withdrawn / abandonedFeb 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0151
Grid region
ERCOT (Texas)
Developer
Nextera
Connection point (POI)
1752 Whitemound 138 kV
Location
Grayson County, Texas
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
16 August 2018
Proposed online date
December 2021
Withdrawn
February 2019

Location

Marker shows the centre of Grayson County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Grayson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem