United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OTHER Β· ERCOT

Callisto II Energy Center

Callisto II Energy Center is a 102 MW other request withdrawn in the ERCOT interconnection queue, in Harris County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandonedAug 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0491
Grid region
ERCOT (Texas)
Developer
Saracen II Energy Storage LLC
Connection point (POI)
47150 HO Clarke 138kV
Location
Harris County, Texas
Technology
Other: 102 MW
Total requested
102 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
15 March 2021
Proposed online date
October 2023
Withdrawn
August 2022

Location

Marker shows the centre of Harris County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Harris County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem