United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Palacios Bay Energy Storage

Palacios Bay Energy Storage is a 101 MW battery storage request withdrawn in the ERCOT interconnection queue, in Matagorda County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2023 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0544
Grid region
ERCOT (Texas)
Developer
Palacios Bay Energy Storage, LLC
Connection point (POI)
Tap 138kV #8115 WADSWORT4A - #8139 CELNEBC4B
Location
Matagorda County, Texas
Technology
Battery: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
18 October 2023
Proposed online date
December 2028
Withdrawn
November 2025

Location

Marker shows the centre of Matagorda County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Matagorda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem