BATTERY STORAGE Β· ERCOT

Nerva Energy Storage

Nerva Energy Storage is a 101 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0559
Grid region
ERCOT (Texas)
Developer
Nerva Energy Storage, LLC
Connection point (POI)
Tap 138kV 402410 BURKE_POI_8 - 42430 EGLNST_POI_8 CKT#02
Technology
Battery: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
19 April 2023
Proposed online date
December 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem