North Leona BESS

North Leona BESS is a 102 MW battery storage request withdrawn in the ERCOT interconnection queue, in Frio County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2024 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
28INR0120
Grid region
ERCOT (Texas)
Developer
Orion US Land Holding Co LLC
Connection point (POI)
Tap 138 KV 8212 Dilly - 5866 Palo Duro_x000D_
Location
Frio County, Texas
Technology
Battery: 102 MW
Total requested
102 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
15 August 2024
Proposed online date
August 2028
Withdrawn
April 2025

Location

Marker shows the centre of Frio County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Frio County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem