United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· ERCOT

Deer BESS

Deer BESS is a 102 MW battery storage request withdrawn in the ERCOT interconnection queue, in Lamar County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2023 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0510
Grid region
ERCOT (Texas)
Developer
GRS BESS Texas Two
Connection point (POI)
1687 BLOOSOM_T8 138kV
Location
Lamar County, Texas
Technology
Battery: 102 MW
Total requested
102 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
7 September 2023
Proposed online date
October 2025
Withdrawn
April 2025

Location

Marker shows the centre of Lamar County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Lamar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem