BATTERY STORAGE Β· ERCOT

Aggie Energy storage

Aggie Energy storage is a 104 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0348
Grid region
ERCOT (Texas)
Developer
KINGFISHER ENERGY STORAGE LLC
Connection point (POI)
TABOR RD (#32882)
Technology
Battery: 104 MW
Total requested
104 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
16 August 2021
Proposed online date
June 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in