McCook Energy Storage

McCook Energy Storage is a 101 MW other request withdrawn in the ERCOT interconnection queue, in Hidalgo County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedDec 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0564
Grid region
ERCOT (Texas)
Developer
McCook Energy Storage, LLC
Connection point (POI)
Direct connection to Mirasole #161705 345kV Substation.
Location
Hidalgo County, Texas
Technology
Other: 101 MW
Total requested
101 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
September 2025
Withdrawn
December 2023

Location

Marker shows the centre of Hidalgo County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hidalgo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem