OTHER Β· ERCOTCanyonland Energy Storage
Canyonland Energy Storage is a 101 MW other request withdrawn in the ERCOT interconnection queue, in Comanche County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2023 (completed)
- Withdrawn / abandonedMay 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0562
- Grid region
- ERCOT (Texas)
- Developer
- Canyonland Energy Storage, LLC
- Connection point (POI)
- 1649 HASSE_P8 138kV
- Location
- Comanche County, Texas
- Technology
- Other: 101 MW
- Total requested
- 101 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 29 November 2023
- Proposed online date
- September 2025
- Withdrawn
- May 2024
Location
Marker shows the centre of Comanche County; the queue data does not give exact sites.
Other requests in Comanche County
- Lamkin SolarSolar Β· 102 MW Β· agreement signed
- Comanche BESSBattery storage Β· 614 MW Β· in study
- Dragan SolarSolar + storage Β· 411 MW Β· in study
- Dragan StorageSolar + storage Β· 408 MW Β· in study
- Merope BESSBattery storage Β· 402 MW Β· in study
- Crios BESSBattery storage Β· 206 MW Β· in study
- BRP Triton BESSBattery storage Β· 205 MW Β· in study
- Saddle Horn Station BESS SLFSolar + storage Β· 177 MW Β· in study
- Saddle Horn Station Solar SLFSolar + storage Β· 175 MW Β· in study
- Darkwood SolarSolar + storage Β· 151 MW Β· in study
- Darkwood BESSSolar + storage Β· 151 MW Β· in study
- Paolo Sole Gustine SolarSolar Β· 40.3 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem