πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Horse Wrangler Storage

Horse Wrangler Storage is a 102 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0274
Grid region
ERCOT (Texas)
Developer
Horse Wrangler Solar Project, LLC
Connection point (POI)
Tap 138kV 8153 Rosata Tap - 8186 Kenedy Switch Ckt 1
Technology
Battery: 102 MW
Total requested
102 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
30 November 2023
Proposed online date
December 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem