United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2020 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gibbons Creek TEERP Coal · TEERP Power Station LLC |
420 MW | Withdrawn / abandoned |
| Plum Creek Solar I Solar · PLUM CREEK SOLAR I, LLC |
400 MW | Withdrawn / abandoned |
| BRP Pobeda BESS Battery storage · BRP Pobeda BESS LLC |
301 MW | Withdrawn / abandoned |
| Sibyl Power Station Gas · WattBridge Energy, LLC |
299 MW | Withdrawn / abandoned |
| BRP Denali BESS Battery storage · BRP Denali BESS LLC |
258 MW | Withdrawn / abandoned |
| Neal Solar Solar · SolarGen Resources LLC |
252 MW | Withdrawn / abandoned |
| BRP Batura BESS Battery storage · BRP Batura BESS LLC |
252 MW | Withdrawn / abandoned |
| Langer Solar Solar · Langer Solar LLC |
250 MW | Withdrawn / abandoned |
| BRP Pular BESS Battery storage · BRP Pular BESS LLC |
233 MW | Withdrawn / abandoned |
| Cottage Meadow Storage Other · KCE TX 18, LLC |
209 MW | Withdrawn / abandoned |
| Neptune Solar Solar · Matagorda Solar LLC |
206 MW | Withdrawn / abandoned |
| Egret Hill Storage Other · Coyote Crossing LLC |
206 MW | Withdrawn / abandoned |
| Galactic Solar Solar · UKA North America, LLC |
205 MW | Withdrawn / abandoned |
| Thunderbird Solar SLF Solar · Thunderbird Solar, LLC |
204 MW | Withdrawn / abandoned |
| Flagtail Batt Other · Flagtail LLC |
204 MW | Withdrawn / abandoned |
| BRP Lyra BESS Other · BRP Lyra BESS LLC |
203 MW | Withdrawn / abandoned |
| Corbin Grid BESS Other · Corbin Grid, LLC |
203 MW | Withdrawn / abandoned |
| Wekiva Grid Battery storage · Wekiva Grid, LLC |
203 MW | Withdrawn / abandoned |
| Sibyl Energy Storage Other · WattBridge Energy, LLC |
202 MW | Withdrawn / abandoned |
| Topaz Energy Storage Other · WattBridge Energy, LLC |
202 MW | Withdrawn / abandoned |
| Clybourn Solar Solar · Leeward Renewable Energy Development, LLC |
202 MW | Withdrawn / abandoned |
| Milwaukee Solar Solar · Leeward Renewable Energy Development, LLC |
202 MW | Withdrawn / abandoned |
| BRP Kailas BESS Battery storage · BRP Kailas BESS LLC |
201 MW | Withdrawn / abandoned |
| Raoul Solar Solar · Leeward Renewable Energy Development, LLC |
201 MW | Withdrawn / abandoned |
| Elston Solar Solar · Leeward Renewable Energy Development, LLC |
201 MW | Withdrawn / abandoned |
| Amsterdam Storage Battery storage · Cottonwood Bayou II Storage, LLC |
201 MW | Withdrawn / abandoned |
| BRP Bonete BESS Battery storage · BRP Bonete BESS LLC |
201 MW | Withdrawn / abandoned |
| Painted Horse Solar Solar · RWE Solar Development, LLC |
201 MW | Withdrawn / abandoned |
| Girasol Solar · OCI SOLAR POWER |
200 MW | Withdrawn / abandoned |
| Bonita Creek Solar Solar · Invenergy Solar Development North America LLC |
200 MW | Withdrawn / abandoned |
| Delilah Solar 3 Solar |
200 MW | Withdrawn / abandoned |
| Brangus Storage Other · 245CK 8me LLC |
200 MW | Withdrawn / abandoned |
| Seaside Solar Solar · Seadrift Solar |
200 MW | Withdrawn / abandoned |
| Hopkins BESS Other · Hopkins Energy, LLC |
188 MW | Withdrawn / abandoned |
| Arana Creek Batt Battery storage · Arana Creek LLC |
154 MW | Withdrawn / abandoned |
| Evergreen Solar Solar · Bucks Bayou LLC |
150 MW | Withdrawn / abandoned |
| Nolan Solar Solar · Tenaska Solar XVII, LLC |
150 MW | Withdrawn / abandoned |
| SkySealy Gas · Sky Global Power Two, LLC |
149 MW | Withdrawn / abandoned |
| Ponil Solar Solar · Innovative Solar 377, LLC |
145 MW | Withdrawn / abandoned |
| Desert Vine Solar Solar · Desert Vine Solar LLC |
121 MW | Withdrawn / abandoned |
| Barrel Summit Storage Other · KCE TX 14, LLC |
117 MW | Withdrawn / abandoned |
| Equinox Storage Battery storage · Invenergy Storage Development LLC |
103 MW | Withdrawn / abandoned |
| Cone Mountain Batt Other · Ramsay Draw LLC |
103 MW | Withdrawn / abandoned |
| Estonian 2 Solar Solar · 249RD 8ME |
102 MW | Withdrawn / abandoned |
| Vorsavio Grid BESS Other · Vorsavio Grid, LLC |
101 MW | Withdrawn / abandoned |
| Beachwood Energy Storage (Mark One BESS) Other · Mark One Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Delilah Solar 4 Solar |
90.0 MW | Withdrawn / abandoned |
| Cannon Solar SLF Solar · Cannon Solar, LLC |
80.0 MW | Withdrawn / abandoned |
| BRP Galan BESS Battery storage · BRP Galan BESS LLC |
76.0 MW | Withdrawn / abandoned |
| SBranch Expansion Solar Solar · CG Wharton County LLC |
76.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)719 · 47.9 GW
- CAISO (California)107 · 46.6 GW
- West (non-ISO utilities)184 · 38.3 GW
- Southeast (non-ISO utilities)178 · 30.1 GW
- MISO (Midcontinent)195 · 27.2 GW
- NYISO (New York)129 · 25.5 GW
- SPP (Southwest Power Pool)60 · 10.4 GW
- ERCOT (Texas)67 · 10.4 GW
- ISO-NE (New England)113 · 9,841 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)