Nolan Solar

Nolan Solar is a 150 MW solar request withdrawn in the ERCOT interconnection queue, in Nolan County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2020 (completed)
  2. Withdrawn / abandonedNov 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0013
Grid region
ERCOT (Texas)
Developer
Tenaska Solar XVII, LLC
Connection point (POI)
1338 Eskota 138kV
Location
Nolan County, Texas
Technology
Solar: 150 MW
Total requested
150 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 January 2020
Proposed online date
June 2023
Withdrawn
November 2020

Location

Marker shows the centre of Nolan County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Nolan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem