United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

SkySealy

SkySealy is a 149 MW gas request withdrawn in the ERCOT interconnection queue, in Austin County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJun 2024 (project stopped here)
  3. ConsentedFeb 2023 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0500
Grid region
ERCOT (Texas)
Developer
Sky Global Power Two, LLC
Connection point (POI)
tap 138kV 44700 Gebhardt - 44740 Wallis circuit 65
Location
Austin County, Texas
Technology
Gas: 149 MW
Total requested
149 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
30 April 2020
Agreement signed
3 February 2023
Proposed online date
June 2025
Withdrawn
June 2024

Location

Marker shows the centre of Austin County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Austin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem