United States › Grid › Interconnection queues › Texas

OTHER · ERCOT

Beachwood Energy Storage (Mark One BESS)

Beachwood Energy Storage (Mark One BESS) is a 101 MW other request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2020 (completed)
  2. Withdrawn / abandonedDec 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0447
Grid region
ERCOT (Texas)
Developer
Mark One Energy Storage, LLC
Connection point (POI)
42110 Angleton 138kV
Location
Brazoria County, Texas
Technology
Other: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
2 December 2020
Proposed online date
November 2024
Withdrawn
December 2023

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.