BATTERY STORAGE Β· ERCOT

BRP Pular BESS

BRP Pular BESS is a 233 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0408
Grid region
ERCOT (Texas)
Developer
BRP Pular BESS LLC
Connection point (POI)
8963 Hidalgo Energy Center 138kV
Technology
Battery: 233 MW
Total requested
233 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
11 September 2020
Proposed online date
December 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem