SOLAR Β· ERCOTSeaside Solar
Seaside Solar is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Calhoun County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2020 (completed)
- Withdrawn / abandonedFeb 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0014
- Grid region
- ERCOT (Texas)
- Developer
- Seadrift Solar
- Connection point (POI)
- tap 138kV 8190 NCarbide βΓΓ¬ 8155 Sandcrab
- Location
- Calhoun County, Texas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 22 December 2020
- Proposed online date
- April 2024
- Withdrawn
- February 2022
Location
Marker shows the centre of Calhoun County; the queue data does not give exact sites.
Other requests in Calhoun County
- Tres Bahias SolarSolar Β· 195 MW Β· agreement signed
- Wolfram StorageBattery storage Β· 207 MW Β· in study
- Vaca StorageBattery storage Β· 101 MW Β· in study
- Formosa IncreaseGas Β· 240 MW Β· built
- VictPortGas Β· 100 MW Β· built
- Canvasback BESSOther Β· 151 MW Β· withdrawn
- Canvasback II BESSOther Β· 50.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem