United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTCanvasback BESS
Canvasback BESS is a 151 MW other request withdrawn in the ERCOT interconnection queue, in Calhoun County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2022 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- ConsentedMay 2024 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0160
- Grid region
- ERCOT (Texas)
- Developer
- Black Mountain Energy Storage II
- Connection point (POI)
- 8155 SANDCRAB4A
- Location
- Calhoun County, Texas
- Technology
- Other: 151 MW
- Total requested
- 151 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 15 August 2022
- Agreement signed
- 8 May 2024
- Proposed online date
- June 2027
- Withdrawn
- December 2024
Location
Marker shows the centre of Calhoun County; the queue data does not give exact sites.
Other requests in Calhoun County
- Tres Bahias SolarSolar Β· 195 MW Β· agreement signed
- Wolfram StorageBattery storage Β· 207 MW Β· in study
- Vaca StorageBattery storage Β· 101 MW Β· in study
- Formosa IncreaseGas Β· 240 MW Β· built
- VictPortGas Β· 100 MW Β· built
- Seaside SolarSolar Β· 200 MW Β· withdrawn
- Canvasback II BESSOther Β· 50.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem