United States βΊ Grid βΊ Interconnection queues βΊ Texas
GAS Β· ERCOTFormosa Increase
Formosa Increase is a 240 MW gas request built and operating in the ERCOT interconnection queue, in Calhoun County, Texas.
Request details
- Queue ID
- 19INR0014
- Grid region
- ERCOT (Texas)
- Developer
- Formosa Plastics
- Connection point (POI)
- 8126 Formosa 138kV
- Location
- Calhoun County, Texas
- Technology
- Gas: 240 MW
- Total requested
- 240 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 11 September 2016
- Agreement signed
- 30 April 2019
- Proposed online date
- January 2023
- Came online
- January 2023
Location
Marker shows the centre of Calhoun County; the queue data does not give exact sites.
Other requests in Calhoun County
- Tres Bahias SolarSolar Β· 195 MW Β· agreement signed
- Wolfram StorageBattery storage Β· 207 MW Β· in study
- Vaca StorageBattery storage Β· 101 MW Β· in study
- VictPortGas Β· 100 MW Β· built
- Seaside SolarSolar Β· 200 MW Β· withdrawn
- Canvasback BESSOther Β· 151 MW Β· withdrawn
- Canvasback II BESSOther Β· 50.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem