πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· ERCOT

Wekiva Grid

Wekiva Grid is a 203 MW battery storage request withdrawn in the ERCOT interconnection queue, in Titus County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2020 (completed)
  2. Withdrawn / abandonedNov 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0067
Grid region
ERCOT (Texas)
Developer
Wekiva Grid, LLC
Connection point (POI)
5925 East DC Tie 345kV
Location
Titus County, Texas
Technology
Battery: 203 MW
Total requested
203 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
20 August 2020
Proposed online date
December 2024
Withdrawn
November 2024

Location

Marker shows the centre of Titus County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Titus County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem