United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· SPPSolar project GEN-2021-055, Titus County
Solar project GEN-2021-055, Titus County is a 240 MW solar request withdrawn in the SPP interconnection queue, in Titus County, Texas, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedJul 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2021-055
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Welsh-Lydia 345kV Line Break
- Location
- Titus County, Texas
- Technology
- Solar: 240 MW
- Total requested
- 240 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 29 April 2021
- Proposed online date
- December 2026
- Withdrawn
- July 2023
Location
Marker shows the centre of Titus County; the queue data does not give exact sites.
Other requests in Titus County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem