BRP Denali BESS

BRP Denali BESS is a 258 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0424
Grid region
ERCOT (Texas)
Developer
BRP Denali BESS LLC
Connection point (POI)
Tap 138kV 5395 Sommers - 5030 Braunig East
Technology
Battery: 258 MW
Total requested
258 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
25 September 2020
Proposed online date
December 2028
Withdrawn
October 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem