Hopkins BESS

Hopkins BESS is a 188 MW other request withdrawn in the ERCOT interconnection queue, in Hopkins County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2020 (completed)
  2. Withdrawn / abandonedJun 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0456
Grid region
ERCOT (Texas)
Developer
Hopkins Energy, LLC
Connection point (POI)
tap 345kV 1685 Farmersvl - 1695 Moses (Circuit #2)
Location
Hopkins County, Texas
Technology
Other: 188 MW
Total requested
188 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
17 November 2020
Proposed online date
May 2023
Withdrawn
June 2021

Location

Marker shows the centre of Hopkins County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hopkins County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem