πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

Sibyl Power Station

Sibyl Power Station is a 299 MW gas request withdrawn in the ERCOT interconnection queue, in Fort Bend County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedJul 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0361
Grid region
ERCOT (Texas)
Developer
WattBridge Energy, LLC
Connection point (POI)
Tap 138kV 43261 Southwyck - 44552 Telview
Location
Fort Bend County, Texas
Technology
Gas: 299 MW
Total requested
299 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
1 September 2020
Proposed online date
July 2025
Withdrawn
July 2024

Location

Marker shows the centre of Fort Bend County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Fort Bend County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem