United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Plum Creek Solar I

Plum Creek Solar I is a 400 MW solar request withdrawn in the ERCOT interconnection queue, in Grimes County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2020 (completed)
  2. Withdrawn / abandonedJun 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0038
Grid region
ERCOT (Texas)
Developer
PLUM CREEK SOLAR I, LLC
Connection point (POI)
tap 345kV 967 Gibbons Creek - 46020 Limestone
Location
Grimes County, Texas
Technology
Solar: 400 MW
Total requested
400 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
8 June 2020
Proposed online date
December 2023
Withdrawn
June 2021

Location

Marker shows the centre of Grimes County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Grimes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem