BATTERY STORAGE Β· ERCOT

BRP Galan BESS

BRP Galan BESS is a 76.0 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0073
Grid region
ERCOT (Texas)
Developer
BRP Galan BESS LLC
Connection point (POI)
5007 Alamo One 138kV
Technology
Battery: 76.0 MW
Total requested
76.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
4 August 2020
Proposed online date
December 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem