United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTBRP Galan BESS
BRP Galan BESS is a 76.0 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0073
- Grid region
- ERCOT (Texas)
- Developer
- BRP Galan BESS LLC
- Connection point (POI)
- 5007 Alamo One 138kV
- Technology
- Battery: 76.0 MW
- Total requested
- 76.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 4 August 2020
- Proposed online date
- December 2027
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem