Desert Vine Solar is a 121 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedDec 2022 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0307
- Grid region
- ERCOT (Texas)
- Developer
- Desert Vine Solar LLC
- Connection point (POI)
- Tap 138kV 8957 Lopeno - 8299 Zapata _x000D_ Will be TSPβΓΓ΄s Snapdragon Station
- Technology
- Solar: 121 MW
- Total requested
- 121 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 1 May 2020
- Agreement signed
- 16 December 2022
- Proposed online date
- December 2026