United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Desert Vine Solar

Desert Vine Solar is a 121 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2022 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0307
Grid region
ERCOT (Texas)
Developer
Desert Vine Solar LLC
Connection point (POI)
Tap 138kV 8957 Lopeno - 8299 Zapata _x000D_ Will be TSPβ€šΓ„Γ΄s Snapdragon Station
Technology
Solar: 121 MW
Total requested
121 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
1 May 2020
Agreement signed
16 December 2022
Proposed online date
December 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem