Elston Solar

Elston Solar is a 201 MW solar request withdrawn in the ERCOT interconnection queue, in Matagorda County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2020 (completed)
  2. Withdrawn / abandonedJan 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0351
Grid region
ERCOT (Texas)
Developer
Leeward Renewable Energy Development, LLC
Connection point (POI)
tap 345kV 44000 WAP - 5915 STP
Location
Matagorda County, Texas
Technology
Solar: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
19 May 2020
Proposed online date
June 2023
Withdrawn
January 2021

Location

Marker shows the centre of Matagorda County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Matagorda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem