United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Neptune Solar

Neptune Solar is a 206 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0499
Grid region
ERCOT (Texas)
Developer
Matagorda Solar LLC
Connection point (POI)
110471 Formosa 138 kV
Technology
Solar: 206 MW
Total requested
206 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
13 April 2020
Proposed online date
December 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem