United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTBonita Creek Solar
Bonita Creek Solar is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Atascosa County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2020 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0065
- Grid region
- ERCOT (Texas)
- Developer
- Invenergy Solar Development North America LLC
- Connection point (POI)
- tap 345kV 5133 Elm Creek - 5901 San Miguel
- Location
- Atascosa County, Texas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 2 December 2020
- Proposed online date
- December 2026
- Withdrawn
- December 2024
Location
Marker shows the centre of Atascosa County; the queue data does not give exact sites.
Other requests in Atascosa County
- Grandslam SolarSolar Β· 122 MW Β· agreement signed
- Paradiso BESSBattery storage Β· 101 MW Β· agreement signed
- Poteet BESSBattery storage Β· 10.0 MW Β· agreement signed
- Bluewind BESSBattery storage Β· 247 MW Β· in study
- Amphion Solar Phase 2Solar Β· 206 MW Β· in study
- Amphion Solar Phase 1Solar Β· 181 MW Β· in study
- Great Hambino BESSBattery storage Β· 123 MW Β· in study
- Amphion Solar Phase 3Solar Β· 115 MW Β· in study
- Reis SolarSolar Β· 106 MW Β· in study
- Kurtz Solar SLFSolar + storage Β· 102 MW Β· in study
- Strawberry Dunes Solar SLFSolar + storage Β· 101 MW Β· in study
- Pleasanton BESSOther Β· 10.0 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem