BATTERY STORAGE Β· ERCOTAmsterdam Storage
Amsterdam Storage is a 201 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedApr 2022 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0417
- Grid region
- ERCOT (Texas)
- Developer
- Cottonwood Bayou II Storage, LLC
- Connection point (POI)
- tap 345kV 43035 Oasis - 42500 Dow c27
- Technology
- Battery: 201 MW
- Total requested
- 201 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 7 October 2020
- Agreement signed
- 14 April 2022
- Proposed online date
- August 2026
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem