United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Amsterdam Storage

Amsterdam Storage is a 201 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedApr 2022 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0417
Grid region
ERCOT (Texas)
Developer
Cottonwood Bayou II Storage, LLC
Connection point (POI)
tap 345kV 43035 Oasis - 42500 Dow c27
Technology
Battery: 201 MW
Total requested
201 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
7 October 2020
Agreement signed
14 April 2022
Proposed online date
August 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem