United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Painted Horse Solar

Painted Horse Solar is a 201 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0243
Grid region
ERCOT (Texas)
Developer
RWE Solar Development, LLC
Connection point (POI)
tap 345kV 5915 STP - 5133 Elm Creek ckt 1
Technology
Solar: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
12 February 2020
Proposed online date
December 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem