United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OTHER Β· ERCOT

Vorsavio Grid BESS

Vorsavio Grid BESS is a 101 MW other request withdrawn in the ERCOT interconnection queue, in Webb County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2020 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0106
Grid region
ERCOT (Texas)
Developer
Vorsavio Grid, LLC
Connection point (POI)
80013 Laredo VFT 138kV
Location
Webb County, Texas
Technology
Other: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 October 2020
Proposed online date
May 2024
Withdrawn
September 2023

Location

Marker shows the centre of Webb County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Webb County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem