United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas — page 36
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Diamond Sage BESS 2 Solar + storage · DGC Renewables, LLC |
100 MW | In study |
| Diamond Sage BESS 1 Solar + storage · DGC Renewables, LLC |
100 MW | In study |
| Coleto Creek ESS Addition Battery storage |
100 MW | Paused / redesign |
| Ardesia Storage Battery storage · Ardesia Storage Project LLC |
100 MW | In study |
| Ne100B Battery storage |
100 MW | Agreement signed |
| Independence Trail Storage Battery storage · KCE TX 16, LLC |
100 MW | In study |
| Solar project J2952, Chambers County Solar |
100 MW | In study |
| Arroyo Solar Solar + storage · BT Cantwell Solar, LLC |
100 MW | Agreement signed |
| Callisto ID Energy Center Battery storage · Tempus Power management LLC |
100 MW | In study |
| Palmvalley Storage Battery storage |
100 MW | Paused / redesign |
| PSE Richardson TX Storage Battery storage · PureSky Development Inc. |
100 MW | In study |
| Solar project J483, Liberty County Solar |
100 MW | Agreement signed |
| Photo BESS 3 Solar + storage · CED Development Inc. |
100 MW | In study |
| Erika BESS Solar + storage · Erika Solar, LLC |
100 MW | In study |
| Galvanic BESS Battery storage · CED Development Inc |
100 MW | In study |
| SS100S Solar |
100 MW | Agreement signed |
| Solar project J4124, Trinity County Solar |
100 MW | In study |
| Radiant Plains Energy Center Solar Solar + storage · Adapture Solar Development |
100 MW | In study |
| San Bernard Solar Solar · Sunchase Power |
100 MW | Paused / redesign |
| Blue Summit Energy Storage Wind + storage · NextEra Energy Interconnection Holdings, LLC |
100 MW | Agreement signed |
| Ne100S Solar |
100 MW | Agreement signed |
| SPC Bloom BESS Battery storage · BRP Blue Topaz 2, LLC |
100 MW | In study |
| IEP Blackhawk Battery storage · IEP Texas Verde II, llc |
100 MW | In study |
| Backwater Storage Battery storage |
100 MW | Paused / redesign |
| Solar project GEN-2024-241, Bowie County Solar |
100 MW | In study |
| Radiant Plains Energy Center BESS Solar + storage · Adapture Solar Development |
100 MW | In study |
| Bordertown BESS Battery storage |
100 MW | Paused / redesign |
| Sunsetter BESS Battery storage · CED Development Inc. |
100 MW | In study |
| Adam Bryant BESS Battery storage · Adam Bryant BESS LLC |
99.5 MW | In study |
| Cannibal Draw Storage Solar + storage · Cannibal Draw Solar, LLC |
98.6 MW | Agreement signed |
| Leitrim 1 Solar Solar · Leitsol LLC |
98.4 MW | In study |
| Midpoint Solar Solar · Midpoint Solar, LLC |
98.3 MW | Agreement signed |
| Rocinante Solar Solar + storage · Brush Country Solar Project, LLC |
95.3 MW | Agreement signed |
| Visol 1 Solar Solar · VISOL 1 SOLAR, LLC |
94.8 MW | In study |
| Timmerman Power Plant Phase 2B Gas · Lower Colorado River Authority |
94.2 MW | Agreement signed |
| Trinity Hills BESS SLF Battery storage · Phoenix Battery Storage, LLC |
94.0 MW | In study |
| High Noon Storage Solar + storage · High Noon Solar Project, LLC |
94.0 MW | Agreement signed |
| PSE Minnesota TX Storage Battery storage · PureSky Development Inc |
94.0 MW | In study |
| Anawa La Solar Solar + storage · Anawa La Solar LLC |
93.3 MW | In study |
| Solar project GEN-2023-241, Franklin County Solar |
93.0 MW | In study |
| Rattlesnake Gap Solar SLF Solar + storage · ET Fuels US Inc. |
93.0 MW | In study |
| Basketflower Storage Solar + storage · Basketflower Solar, LLC |
92.0 MW | In study |
| Raghorn Solar SLF Solar + storage · Raghorn Solar LLC |
91.9 MW | In study |
| Callan Solar Solar · Menard PV, LLC |
91.0 MW | In study |
| Rosscommon Solar Solar · Roscsol, LLC |
91.0 MW | In study |
| Camellia Storage Battery storage · Camellia Storage Project LLC |
90.8 MW | In study |
| Wild Horse Desert Storage Solar + storage · Wild Horse Desert Solar, LLC |
90.3 MW | In study |
| Tyson Nick Solar Solar · Tyson Nick Solar Project, LLC |
90.0 MW | Paused / redesign |
| Wishbone Storage (SLF) Battery storage |
90.0 MW | Paused / redesign |
| Demeter Solar Solar + storage · Demeter Solar, LLC |
88.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,976 · 447.2 GW
- SPP (Southwest Power Pool)79 · 20.6 GW
- MISO (Midcontinent)27 · 6,659 MW
- West (non-ISO utilities)12 · 1,947 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)