BATTERY STORAGE Β· ERCOTBackwater Storage
Backwater Storage is a 100 MW battery storage request suspended in the ERCOT interconnection queue, in Cooke County, Texas.
Queue statusPaused / redesign
- PlanningQueued Sep 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 23INR0375
- Grid region
- ERCOT (Texas)
- Location
- Cooke County, Texas
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Queue status
- Suspended
- Entered queue
- 16 September 2021
Location
Marker shows the centre of Cooke County; the queue data does not give exact sites.
Other requests in Cooke County
- Two Forks BESSBattery storage Β· 310 MW Β· agreement signed
- WildwindOnshore wind Β· 180 MW Β· agreement signed
- Trojan Solar SLFSolar + storage Β· 151 MW Β· agreement signed
- 18-Alpha BESSBattery storage Β· 307 MW Β· in study
- Tennuto BESSBattery storage Β· 202 MW Β· in study
- Mountain Springs BESSBattery storage Β· 151 MW Β· in study
- Backwater SolarSolar Β· 80.0 MW Β· suspended
- Rippey SolarSolar Β· 59.8 MW Β· built
- Muenster BESSOther Β· 9.9 MW Β· built
- Wolf Ridge RepowerOnshore wind Β· 9.0 MW Β· built
- Amber StorageOther Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem