United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTRippey Solar
Rippey Solar is a 59.8 MW solar request built and operating in the ERCOT interconnection queue, in Cooke County, Texas.
Request details
- Queue ID
- 20INR0031
- Grid region
- ERCOT (Texas)
- Developer
- BT Cooke Solar, LLC
- Connection point (POI)
- tap 138kV 1988 ValleyV - 1710 Gainvl
- Location
- Cooke County, Texas
- Technology
- Solar: 59.8 MW
- Total requested
- 59.8 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 1 October 2017
- Agreement signed
- 15 May 2019
- Proposed online date
- December 2020
- Came online
- December 2020
Location
Marker shows the centre of Cooke County; the queue data does not give exact sites.
Other requests in Cooke County
- Two Forks BESSBattery storage Β· 310 MW Β· agreement signed
- WildwindOnshore wind Β· 180 MW Β· agreement signed
- Trojan Solar SLFSolar + storage Β· 151 MW Β· agreement signed
- 18-Alpha BESSBattery storage Β· 307 MW Β· in study
- Tennuto BESSBattery storage Β· 202 MW Β· in study
- Mountain Springs BESSBattery storage Β· 151 MW Β· in study
- Backwater StorageBattery storage Β· 100 MW Β· suspended
- Backwater SolarSolar Β· 80.0 MW Β· suspended
- Muenster BESSOther Β· 9.9 MW Β· built
- Wolf Ridge RepowerOnshore wind Β· 9.0 MW Β· built
- Amber StorageOther Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem