Adam Bryant BESS is a 99.5 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Medina County, Texas.
Queue statusIn planning
- PlanningQueued Feb 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 25INR0610
- Grid region
- ERCOT (Texas)
- Developer
- Adam Bryant BESS LLC
- Connection point (POI)
- Tap 138kV 5225 HONDO – 5819 HONDO CREEK
- Location
- Medina County, Texas
- Technology
- Battery: 99.5 MW
- Total requested
- 99.5 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 26 February 2024
- Proposed online date
- December 2027
Location
Marker shows the centre of Medina County; the queue data does not give exact sites.
Other requests in Medina County
- Devine Mary BESSBattery storage · 201 MW · in study
- Chacon CreekBattery storage · 189 MW · in study
- Ranger BESSBattery storage · 155 MW · in study
- Dunlay SolarSolar · 151 MW · in study
- Hondo Arroyo StorageSolar + storage · 101 MW · in study
- Hondo Arroyo SolarSolar + storage · 60.4 MW · in study
- Spinel SolarSolar · 30.0 MW · suspended
- Cowboy SolarSolar · 208 MW · withdrawn
- Clarion SolarSolar · 180 MW · withdrawn
- Hedgehog SolarSolar · 85.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem