SOLAR Β· ERCOTHedgehog Solar
Hedgehog Solar is a 85.0 MW solar request withdrawn in the ERCOT interconnection queue, in Medina County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2019 (completed)
- Withdrawn / abandonedJul 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0014
- Grid region
- ERCOT (Texas)
- Developer
- Innovative Solar 408, LLC
- Connection point (POI)
- tap 138kV 8234 Uvalde - 8241 Razorback
- Location
- Medina County, Texas
- Technology
- Solar: 85.0 MW
- Total requested
- 85.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 10 December 2019
- Proposed online date
- July 2025
- Withdrawn
- July 2024
Location
Marker shows the centre of Medina County; the queue data does not give exact sites.
Other requests in Medina County
- Devine Mary BESSBattery storage Β· 201 MW Β· in study
- Chacon CreekBattery storage Β· 189 MW Β· in study
- Ranger BESSBattery storage Β· 155 MW Β· in study
- Dunlay SolarSolar Β· 151 MW Β· in study
- Hondo Arroyo StorageSolar + storage Β· 101 MW Β· in study
- Adam Bryant BESSBattery storage Β· 99.5 MW Β· in study
- Hondo Arroyo SolarSolar + storage Β· 60.4 MW Β· in study
- Spinel SolarSolar Β· 30.0 MW Β· suspended
- Cowboy SolarSolar Β· 208 MW Β· withdrawn
- Clarion SolarSolar Β· 180 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem