United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Hedgehog Solar

Hedgehog Solar is a 85.0 MW solar request withdrawn in the ERCOT interconnection queue, in Medina County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2019 (completed)
  2. Withdrawn / abandonedJul 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0014
Grid region
ERCOT (Texas)
Developer
Innovative Solar 408, LLC
Connection point (POI)
tap 138kV 8234 Uvalde - 8241 Razorback
Location
Medina County, Texas
Technology
Solar: 85.0 MW
Total requested
85.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
10 December 2019
Proposed online date
July 2025
Withdrawn
July 2024

Location

Marker shows the centre of Medina County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Medina County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem