United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Clarion Solar

Clarion Solar is a 180 MW solar request withdrawn in the ERCOT interconnection queue, in Medina County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2021 (completed)
  2. Withdrawn / abandonedApr 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0025
Grid region
ERCOT (Texas)
Developer
IBV Energy Partners LLC
Connection point (POI)
5290 Lytle 138kV
Location
Medina County, Texas
Technology
Solar: 180 MW
Total requested
180 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
28 February 2021
Proposed online date
August 2024
Withdrawn
April 2024

Location

Marker shows the centre of Medina County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Medina County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem