BATTERY STORAGE · ERCOT

SPC Bloom BESS

SPC Bloom BESS is a 100 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Victoria County, Texas.

Queue statusIn planning
  1. PlanningQueued Dec 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
22INR0445
Grid region
ERCOT (Texas)
Developer
BRP Blue Topaz 2, LLC
Connection point (POI)
8911 Black Bayou 138kV
Location
Victoria County, Texas
Technology
Battery: 100 MW
Total requested
100 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
3 December 2020
Proposed online date
April 2027

Location

Marker shows the centre of Victoria County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Victoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem