United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Texas — page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,094476.4 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,094 requests · page 2 of 42
ProjectCapacityStatusLocationRegionQueuedOnline
Axis Ridge Wind
Onshore wind · Axis Ridge Wind, LLC
750 MWIn study Sutton, TXERCOT Nov 2024target 2029
Nabla Energy Storage I
Battery storage · Nabla Park LLC
750 MWIn study Tarrant, TXERCOT Nov 2025target 2028
Central Power Station
Gas · Hydra-Gen Energy Unlimited
750 MWIn study Grimes, TXERCOT Mar 2024target 2027
Nabla Energy Storage II
Battery storage · Nabla Park LLC
750 MWIn study Parker, TXERCOT Nov 2025target 2028
FGE Texas 2 Gas
Gas · FGE Power
743 MWPaused / redesign Mitchell, TXERCOT Feb 2014target 2028
Buffalo Jump Wind
Onshore wind · BOULEVARD ASSOCIATES, LLC
740 MWIn study Culberson, TXERCOT Nov 2025target 2029
Meitner 2 Wind
Onshore wind · IP Meitner, LLC
709 MWIn study Gray, TXERCOT Jun 2025target 2028
Meitner Wind
Onshore wind · IP Meitner, LLC
709 MWAgreement signed Gray, TXERCOT Jul 2023target 2027
Meitner Solar
Solar · IP Meitner, LLC
703 MWAgreement signed Gray, TXERCOT Aug 2022target 2027
Cedar Bayou 5 (TEF - Due Diligence)
Gas · NRG Cedar Bayou 5 LLC
697 MWAgreement signed Chambers, TXERCOT Mar 2020target 2027
Texpo
Gas · Oklaunion Power Station, LLC
680 MWIn study Wilbarger, TXERCOT Mar 2021target 2027
Dovetail Solar 3
Solar + storage · Hecate Energy Dovetail Solar Holdings LLC
666 MWIn study Jack, TXERCOT Dec 2021target 2029
Dovetail Solar 1
Solar + storage · Hecate Energy Dovetail Solar 1 LLC
666 MWIn study Jack, TXERCOT Sep 2021target 2027
Dovetail Solar 2
Solar + storage · Hecate Energy Dovetail Solar 2 LLC
666 MWIn study Jack, TXERCOT Oct 2021target 2029
Jack County III – 345 kV
Gas · Jack County Power Development, LLC
660 MWIn study Jack, TXERCOT Nov 2023target 2027
Coleto Creek - Fuel Change Only
Gas · COLETO CREEK POWER LLC
655 MWIn study Goliad, TXERCOT Apr 2025target 2026
Pinnington Solar
Solar + storage · Hecate Energy Longhorn Solar LLC
654 MWAgreement signed Jack, TXERCOT Dec 2020target 2026
Commodus 2 Wind
Onshore wind · IP Blackwell II, LLC
642 MWIn study Swisher, TXERCOT Mar 2025target 2029
Commodus Wind
Onshore wind · IP Blackwell, LLC
641 MWIn study Briscoe, TXERCOT Jul 2024target 2029
Cavell Wind
Onshore wind · IP Cavell, LLC
641 MWIn study Castro, TXERCOT Jul 2024target 2029
Short Creek Solar
Solar + storage · Wichita Solar I, LLC
628 MWAgreement signed Wichita, TXERCOT Jan 2022target 2027
Aurelius 3 Wind
Onshore wind · IP Roman III, LLC
623 MWIn study Deaf Smith, TXERCOT Dec 2023target 2029
Aurelius 2 Wind
Onshore wind · IP Roman Wind II, LLC
622 MWIn study Deaf Smith, TXERCOT Dec 2023target 2028
Aurelius Wind
Onshore wind · IP Roman Wind, LLC
622 MWAgreement signed Deaf Smith, TXERCOT Aug 2023target 2028
Howard Road BESS
Battery storage · Project Fast Flow LLC
618 MWIn study Bexar, TXERCOT Jul 2025target 2028
Comanche BESS
Battery storage · ENERGOS BESS
614 MWIn study Comanche, TXERCOT Dec 2024target 2028
Tumbleweed Solar
Solar + storage · Hecate Energy Tumbleweed Solar LLC
614 MWIn study Borden, TXERCOT Sep 2023target 2027
Symphony BESS
Battery storage · Symphony BESS, LLC
612 MWIn study Austin, TXERCOT Feb 2025target 2028
Skylab Solar
Solar · EDF Renewables Development, Inc.
610 MWIn study Wharton, TXERCOT Jun 2020target 2025
White Oak King Wind
Onshore wind · KSK Wind Farm 1, LLC
607 MWIn study King, TXERCOT Mar 2023target 2027
Kingsmill Wind SLF
Onshore wind · Kingsmill Wind, LLC
606 MWIn study Carson, TXERCOT Jan 2024target 2029
Lavita BESS
Battery storage · Lavita BESS, LLC
606 MWIn study Bell, TXERCOT Dec 2024target 2028
Hiru Solar
Solar + storage · Hecate Energy Hazel LLC
604 MWIn study Clay, TXERCOT Apr 2021target 2029
Moccasin Solar
Solar + storage · Swenson Solar LLC
604 MWAgreement signed Stonewall, TXERCOT Sep 2023target 2027
Operation Sunshine
Solar + storage · Duck Creek Solar, LLC
603 MWAgreement signed Concho, TXERCOT Nov 2023target 2028
Moccasin Storage
Solar + storage · ENGIE IR Holdings LLC
603 MWIn study Jones, TXERCOT Jan 2025target 2028
Danish Fields Solar
Solar · Danish Fields Solar, LLC
603 MWAgreement signed Wharton, TXERCOT Apr 2018target 2026
Hobby BESS I
Battery storage · Airport Storage II LLC
603 MWIn study Harris, TXERCOT Sep 2024target 2027
Rocking X Solar
Solar · 7100 Tin Top LLC
602 MWIn study Parker, TXERCOT Oct 2023target 2027
Cachena Solar SLF
Solar + storage · Clear Fork Creek Solar LLC
601 MWAgreement signed Wilson, TXERCOT May 2020target 2027
Reunion Solar
Solar + storage · Reunion Solar, LLC
601 MWIn study Wilbarger, TXERCOT Mar 2025target 2028
Scorpius Solar
Solar · Ben Milam Solar 4
600 MWIn study Milam, TXERCOT Dec 2024target 2029
Tempesta BESS
Battery storage
600 MWPaused / redesign Kaufman, TXERCOT Jun 2022
Longleaf Power Station
Gas · WattBridge Texas Holding, LLC
600 MWIn study Angelina, TXERCOT Oct 2023target 2028
Capoterra BESS
Battery storage
600 MWPaused / redesign Milam, TXERCOT Jun 2022
Tehuacana Wind
Onshore wind
600 MWPaused / redesign Limestone, TXERCOT Jun 2017
Sitges Wind
Onshore wind · NextEra Energy Interconnection Holdings, LLC
600 MWIn study Motley, TXERCOT Mar 2024target 2029
Proteus London-Leigh Solar SLF
Solar + storage · London Leigh Solar, LLC
600 MWIn study Glasscock, TXERCOT Mar 2024target 2028
Capoterra
Solar
598 MWPaused / redesign Milam, TXERCOT Jun 2022
Brittlebush BESS
Battery storage
597 MWPaused / redesign Henderson, TXERCOT Jun 2022
Page 2 of 42

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)