United States › Grid › Interconnection queues › Texas
SOLAR · ERCOTRocking X Solar
Rocking X Solar is a 602 MW solar request in interconnection study in the ERCOT interconnection queue, in Parker County, Texas.
Queue statusIn planning
- PlanningQueued Oct 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 23INR0368
- Grid region
- ERCOT (Texas)
- Developer
- 7100 Tin Top LLC
- Connection point (POI)
- Tap the 345 kV Parker Switch (bus#1436) – Comanche Peak SES (bus#1900) Double-Circuit line, Circuit 1.
- Location
- Parker County, Texas
- Technology
- Solar: 602 MW
- Total requested
- 602 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 4 October 2023
- Proposed online date
- September 2027
Location
Marker shows the centre of Parker County; the queue data does not give exact sites.
Other requests in Parker County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem