United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2024 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Perseus Gas Gas · Engie Flexible Generation NA LLC |
1,057 MW | Withdrawn / abandoned |
| ELTEX Power Station Gas · ELTEX Power Station LLC |
488 MW | Withdrawn / abandoned |
| Denver City - Mustang - Gas Gas · Golden Spread Electric Cooperative, Inc. |
472 MW | Withdrawn / abandoned |
| Kiskadee Trail Storage SLF Battery storage · Kiskadee Trail Storage, LLC |
406 MW | Withdrawn / abandoned |
| Kiskadee Trail Solar SLF Solar · Kiskadee Trail Solar, LLC |
406 MW | Withdrawn / abandoned |
| Austin Bayou Solar II Solar · Austin Bayou Solar, LLC |
402 MW | Withdrawn / abandoned |
| Firefly Power Battery storage · Firefly Power LLC |
401 MW | Withdrawn / abandoned |
| Savanna Prairie Solar Solar · Savanna Prairie Solar, LLC |
355 MW | Withdrawn / abandoned |
| Adams Brook Storage Other · Adams Creek Solar Project, LLC |
314 MW | Withdrawn / abandoned |
| Fletcher BESS Battery storage · Archer Energy Center, LLC |
310 MW | Withdrawn / abandoned |
| Box Canyon Energy Storage Other · Box Canyon Energy Storage Project, LLC |
306 MW | Withdrawn / abandoned |
| Goose Foot Energy Storage Battery storage · Goose Foot Energy Storage Project, LLC |
306 MW | Withdrawn / abandoned |
| Mariette Solar Solar · Mariette Solar LLC |
301 MW | Withdrawn / abandoned |
| Sentinel Solar Solar · Alamo Ranch Solar Project, LLC |
271 MW | Withdrawn / abandoned |
| Rippling Curve Peaking Power Gas · OxyVinyls LP |
208 MW | Withdrawn / abandoned |
| Shoe Bar Solar Solar · Oberon Solar V, LLC |
206 MW | Withdrawn / abandoned |
| Tierra Alta Storage SLF Battery storage · ET Fuels US Inc. |
205 MW | Withdrawn / abandoned |
| North Leona Solar Solar · Orion US Land Holding Co LLC |
205 MW | Withdrawn / abandoned |
| Medellin Road BESS Other · Horizon Energy Storage Green Field |
203 MW | Withdrawn / abandoned |
| HyFuels Iron Horse Solar Solar · HyFuels Green Lake Solar LLC |
201 MW | Withdrawn / abandoned |
| Ridley Solar SLF Solar · Ridley Solar Project, LLC |
201 MW | Withdrawn / abandoned |
| Altita Solar Solar · ACE DevCo NC, LLC |
182 MW | Withdrawn / abandoned |
| South Loop Energy Center Battery storage · Concurrent Holdco LLC |
161 MW | Withdrawn / abandoned |
| Villarreal Solar SLF Solar · Orion US Land Holding Co LLC |
153 MW | Withdrawn / abandoned |
| Veco Ranch Solar SLF Solar · Orion US Land Holding Co LLC |
153 MW | Withdrawn / abandoned |
| Gail Mountain Solar Solar · Gail Mountain Solar, LLC |
152 MW | Withdrawn / abandoned |
| Gail Mountain Storage Battery storage · Gail Mountain Solar, LLC |
152 MW | Withdrawn / abandoned |
| Olsovksy Storage Battery storage · BT Sky Storage, LLC |
151 MW | Withdrawn / abandoned |
| Augite Storage Battery storage · BT Augite Storage, LLC |
151 MW | Withdrawn / abandoned |
| Larimar Solar Solar · BT S7 Solar, LLC |
151 MW | Withdrawn / abandoned |
| Paddlewheel Solar SLF Solar · Paddlewheel Solar, LLC |
150 MW | Withdrawn / abandoned |
| Sugar Land Power Plant Gas · Imperial Power Plant, LLC |
148 MW | Withdrawn / abandoned |
| Savanna Prairie Storage Battery storage · Savanna Prairie Storage, LLC |
114 MW | Withdrawn / abandoned |
| Bluewind Energy Center Battery storage · Bluewind Energy Center, LLC |
103 MW | Withdrawn / abandoned |
| North Leona BESS Battery storage · Orion US Land Holding Co LLC |
102 MW | Withdrawn / abandoned |
| Larimar Storage Battery storage · BT S7 Solar, LLC |
101 MW | Withdrawn / abandoned |
| Texas Sage Solar SLF Solar · Texas Sage Solar Project, LLC |
101 MW | Withdrawn / abandoned |
| Kobernat Solar Solar · BT Kobernat Solar, LLC |
101 MW | Withdrawn / abandoned |
| Mica BESS Battery storage · Mica BESS LLC |
80.4 MW | Withdrawn / abandoned |
| Gold Coin Storage Battery storage · Grenergy USA |
73.0 MW | Withdrawn / abandoned |
| Kobernat Storage Battery storage · BT Kobernat Solar, LLC |
51.5 MW | Withdrawn / abandoned |
| Paddlewheel BESS SLF Battery storage · Paddlewheel Solar, LLC |
50.0 MW | Withdrawn / abandoned |
| Kiskadee Trail Solar Solar · Kiskadee Solar, LLC |
40.9 MW | Withdrawn / abandoned |
| Kiskadee Trail Storage Battery storage · Kiskadee Storage, LLC |
40.8 MW | Withdrawn / abandoned |
| Arroyo Storage (Placeholder) Other · BT Cantwell Solar, LLC |
35.3 MW | Withdrawn / abandoned |
| Mills Prairie Solar Solar · Mills Solar, LLC |
33.0 MW | Withdrawn / abandoned |
| Mills Prairie Storage Battery storage · Mills Storage, LLC |
33.0 MW | Withdrawn / abandoned |
| Nightfall BESS SLF Battery storage · BDPU Solar Nightfall, LLC |
11.0 MW | Withdrawn / abandoned |
| Jourdanton BESS Battery storage · Jourdanton BESS LLC |
9.8 MW | Withdrawn / abandoned |
| E Babe Smith Solar Solar · Hwy 183 Solar LLC |
7.6 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)411 · 78.5 GW
- NYISO (New York)294 · 63.3 GW
- West (non-ISO utilities)237 · 46.1 GW
- Southeast (non-ISO utilities)195 · 32.8 GW
- ISO-NE (New England)97 · 13.2 GW
- ERCOT (Texas)50 · 10.0 GW
- SPP (Southwest Power Pool)29 · 7,503 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)