BATTERY STORAGE Β· ERCOT

Gold Coin Storage

Gold Coin Storage is a 73.0 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0366
Grid region
ERCOT (Texas)
Developer
Grenergy USA
Connection point (POI)
Tap 138kV 1470 Newport - 616 Carter
Technology
Battery: 73.0 MW
Total requested
73.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
19 November 2024
Proposed online date
July 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem