πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· ERCOT

Mica BESS

Mica BESS is a 80.4 MW battery storage request withdrawn in the ERCOT interconnection queue, in Harris County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2024 (completed)
  2. Withdrawn / abandonedFeb 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0610
Grid region
ERCOT (Texas)
Developer
Mica BESS LLC
Connection point (POI)
42240 CARDIFF 138kV_x000D_ _x000D_
Location
Harris County, Texas
Technology
Battery: 80.4 MW
Total requested
80.4 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
18 November 2024
Proposed online date
January 2026
Withdrawn
February 2025

Location

Marker shows the centre of Harris County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Harris County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem