πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Kiskadee Trail Solar

Kiskadee Trail Solar is a 40.9 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0250
Grid region
ERCOT (Texas)
Developer
Kiskadee Solar, LLC
Connection point (POI)
Tap 138kV 8005 Carrizo Springs - 8006 Crystal City
Technology
Solar: 40.9 MW
Total requested
40.9 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
13 June 2024
Proposed online date
May 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem