United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Ridley Solar SLF

Ridley Solar SLF is a 201 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0377
Grid region
ERCOT (Texas)
Developer
Ridley Solar Project, LLC
Connection point (POI)
Tap 138kV 8912 Medio Creek - 8920 HAISLEY
Technology
Solar: 201 MW
Total requested
201 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 July 2024
Proposed online date
March 2029

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem