BATTERY STORAGE Β· ERCOT

Kiskadee Trail Storage SLF

Kiskadee Trail Storage SLF is a 406 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
28INR0171
Grid region
ERCOT (Texas)
Developer
Kiskadee Trail Storage, LLC
Connection point (POI)
Tap 138kV 8005 Carrizo Springs - 8006 Crystal City
Technology
Battery: 406 MW
Total requested
406 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 October 2024
Proposed online date
October 2029

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem