SOLAR Β· ERCOT

Austin Bayou Solar II

Austin Bayou Solar II is a 402 MW solar request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2024 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0367
Grid region
ERCOT (Texas)
Developer
Austin Bayou Solar, LLC
Connection point (POI)
Tap 345 kV Savannah 43180 - Seabreeze 43020 ckt #27
Location
Brazoria County, Texas
Technology
Solar: 402 MW
Total requested
402 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
28 March 2024
Proposed online date
June 2027
Withdrawn
January 2025

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem