United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· ERCOT

Larimar Storage

Larimar Storage is a 101 MW battery storage request withdrawn in the ERCOT interconnection queue, in Bee County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2024 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0383
Grid region
ERCOT (Texas)
Developer
BT S7 Solar, LLC
Connection point (POI)
A DIRECT CONNECTION TO A NEW SWITCHING STATION ON THE KENEDYSW4A (BUS #8186) β€šΓ„Γͺ TULETA4A (BUS #8590) 138 KV LINE
Location
Bee County, Texas
Technology
Battery: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
10 January 2024
Proposed online date
December 2026
Withdrawn
April 2025

Location

Marker shows the centre of Bee County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem