BATTERY STORAGE Β· ERCOT

Goose Foot Energy Storage

Goose Foot Energy Storage is a 306 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
27INR0280
Grid region
ERCOT (Texas)
Developer
Goose Foot Energy Storage Project, LLC
Connection point (POI)
Tap 345 kV 11318 Scurry County Switch β€šΓ„Γ¬ 11048 Tonkawa Ckt#2
Technology
Battery: 306 MW
Total requested
306 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
19 December 2024
Proposed online date
October 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem