BATTERY STORAGE Β· ERCOTGoose Foot Energy Storage
Goose Foot Energy Storage is a 306 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 27INR0280
- Grid region
- ERCOT (Texas)
- Developer
- Goose Foot Energy Storage Project, LLC
- Connection point (POI)
- Tap 345 kV 11318 Scurry County Switch βΓΓ¬ 11048 Tonkawa Ckt#2
- Technology
- Battery: 306 MW
- Total requested
- 306 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 19 December 2024
- Proposed online date
- October 2028
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem